top of page
MIDDEL MWT SITE 2026 NERROW BANNER  (3).png

ICE MACHINE WATER SAFETY · LOG 10 CERTIFIED · INLINE FILTRATION

Your ice machine has a water supply line. That's where bacteria enter.

MWT inline filters install at the supply line - before the water reaches your machine. Log 10 certified bacterial reduction. No equipment modification. Five-minute install.

Log 10

Bacterial reduction

0.08 µm

Membrane pore size

3,700 gal

Service life

150 days

Filter service life

ASTM F838-20 · Log 10

NSF P376

FDA Registered

No machine modification

The three risk points - before the water freezes

#1

Supply line temperature

Water in supply lines remains at ambient temperature between production cycles, within Legionella growth range. The ice machine chills water internally, but upstream lines and hoses are not temperature controlled.

#2

Idle water stagnation

Overnight. Weekends. Low-demand periods. Stagnant water in the supply line and inlet valve is when biofilm forms and bacteria count builds - before the next batch of ice is made.

#3

Direct exposure pathway

Ice is consumed directly or in beverages. While ingestion risk is low, aspiration of contaminated meltwater can introduce bacteria into the lungs. Freezing preserves bacteria until thawing.

Legionella and ice machines in the United States

MWT Inline Purflow® filters are installed on the supply line, before water reaches the machine. Log 10 certified bacterial reduction. No equipment modification required.

increase in US Legionnaires' cases since 2000 - CDC surveillance

9.3%

average annual case increase rate since 2002 —

CDC

20%

of all US cases are healthcare-associated — highest fatality rate​

CMS

names ice machines as a required control point in QSO-17-30 WMPs

Three solutions. One for every facility size.

Pick the right configuration for your setup -  all Log 10 certified, FDA registered, no machine modification required.

23.png

Option 1 — Standard

Inline Pureflow Blue®

Bacterial filtration at the supply line

0.08 µm

Log 10

3,700 gal

Installs on the cold water supply line entering the ice machine. Hollow fiber 0.08 µm membrane removes Legionella, NTM, and E. coli before water enters the unit. Standard threaded pipe connections.

✓ BEST FOR

Single-machine installs · Hotels · Dental offices · Small clinics · Any standard ice machine with a water supply line

24.png

Option 2 — Full Protection

Inline Pureflow Blue® + Red®

Sediment pre-filter + bacterial filtration

0.08 µm Final Stage

2 stages 

Log 10

The Red® sediment strainer (20µm + 10µm) captures particles and scale upstream — protecting the Blue® membrane from fouling and extending its service life. The Blue® then delivers Log 10 bacterial reduction at the final stage. Best choice when source water quality is unknown or variable.

✓ BEST FOR

Single-machine installs · Hotels · Dental offices · Small clinics · Any standard ice machine with a water supply line

25.png

Option 3 — High Volume

AquaGuard Pro®

High-capacity Log 10 system — click-connect replacement

0.08 µm

Log 10

9,000 gal

9,000-gallon capacity,  2.4× longer life than the Inline Blue®. The click-connect system lets your team swap the filter in seconds without dismantling the unit. Built for facilities with multiple ice machines or 24/7 high-volume output.

✓ BEST FOR

Single-machine installs · Hotels · Dental offices · Small clinics · Any standard ice machine with a water supply line

Legionella confirmed?

Corrective action is expected immediately by CMS and state health authorities.

EMERGENCY WATER SAFETY RESPONSE 

Expert Support. Immediate Response.
Same-day dispatch

When Legionella is confirmed at a hotel or resort property, immediate corrective action is required. Health departments, insurance carriers, and corporate stakeholders expect implemented, documented control measures at the follow up inspection. Purchase orders and proposals are not sufficient to clear a public health notice or satisfy liability requirements.

Installed point of use filtration with FDA and ASTM documentation provides a clear, auditable corrective measure.

MWT systems are designed for same day dispatch and allow facility staff to complete installation in under 5 minutes per fixture. This ensures guest safety and regulatory compliance using medical grade technology without the need for a licensed plumber or system shutdown.

¿Tiene preguntas o necesita más información?

Póngase en contacto con nosotros para obtener cotizaciones, información detallada sobre productos, soporte de instalación y más.

¿Tiene preguntas o necesita más información?

Póngase en contacto con nosotros para obtener cotizaciones, información detallada sobre productos, soporte de instalación y más.

¿Tiene preguntas o necesita más información?

Póngase en contacto con nosotros para obtener cotizaciones, información detallada sobre productos, soporte de instalación y más.

¿Tiene preguntas o necesita más información?

Póngase en contacto con nosotros para obtener cotizaciones, información detallada sobre productos, soporte de instalación y más.

bottom of page