top of page
18.png

PUBLIC INFRASTRUCTURE

Educational and government facilities face systemic water stagnation during seasonal breaks. Are returning students and public employees protected from waterborne pathogens?

Aging plumbing and extended closures in public buildings create ideal environments for Legionella growth and biofilm accumulation. ASHRAE 188 and state mandates like New Jersey S4632 establish rigorous Water Management Program obligations for all public institutions.

Budget conscious administrators prioritize MWT solutions because they combine 180 day service life with the lowest total cost of ownership for taxpayers.

MANDATES THAT APPLY TO YOUR FACILITY

  • ASHRAE 188 - This national standard requires all public buildings with complex plumbing to implement a documented Water Management Program
     

  • EPA Safe Drinking Water Act - Federal law establishes the baseline safety standards for water quality in all government and educational facilities.
     

  • State Safety Codes - Legislation like New Jersey S4632 mandates specific testing and filtration protocols to protect students and public staff.

THE NUMBERS THAT MATTER

90 Days

Typical seasonal school closures provide the exact stagnation window required for dangerous Legionella and biofilm growth.

500+ CFU/mL

Bacteria levels in stagnant school plumbing frequently exceed safety limits during extended periods of low building occupancy.

$0.00

MWT products require zero infrastructure modifications or licensed contractors for installation across aging public school plumbing systems.

180 Days

One filter change covers an entire academic year while aligning perfectly with standard facility preventive maintenance.

WHY THIS RISK IS DIFFERENT IN PUBLIC INFRASTRUCTURE

CRITICAL WATER SAFETY POINTS: ESSENTIAL SAFEGUARDS FOR PUBLIC INFRASTRUCTURE

Critical Control point 1

Critical Control point 2

Critical Control point 3

PREVENTION — WHAT YOUR WMP NEEDS AT THE FIXTURE LEVEL

total.png

TotalPure® - POE

Point-of-Entry· Model QF10-80

Designed to deliver advanced, high-capacity filtration for specific zones. This system incorporates certified bacterial reduction technology along with robust particulate filtration, effectively targeting sediments, fine sand, clay, rust particles, and other common feed water contaminants.

Service life: 40,000gal

ASTM F838-20 (Log 10 )

FDA Est. #10094411

EPA FIFRA #105402-NLD-1

Inline Pureflow® HF (Blue).png

Inline Pureflow BLUE®

Inline ·  FDA-registered · Model QF10-177

Engineered to reduce microbial contaminants in water, including Legionella pneumophila, Nontuberculous Mycobacteria (NTM), E. coli, Salmonella, and other waterborne bacteria.

Service life: Up to 3,700 gal

ASTM F838-20 (Log 10 )

NSF P376

ASSE 2011-2022

EPA WaterSense   

FDA Est. #10094411

EPA FIFRA #105402-NLD-1

SkyStream® - ceiling-mounted showerhead Type 3 (11cm).png

SkyStream® - Mounted / ceiling showerhead filter

Point-of-use · Mounted showerhead · FDA-registered · Model QF10-177

Installs inline between existing arm and head. ADA-compliant. Compatible with bariatric and rehab gym configurations. Four spray modes including rain and steam.

Service life: Up to 135 Days

ASTM F838-20 (Log 10 )

NSF P376

ASSE 2011-2022

EPA WaterSense   

FDA Est. #10094411

EPA FIFRA #105402-NLD-1

Legionella confirmed?

Corrective action is expected immediately by CMS and state health authorities.

EMERGENCY WATER SAFETY RESPONSE 

Expert Support. Immediate Response.
Same-day dispatch

When Legionella is confirmed at a public school or government building, immediate corrective action is mandatory. Health departments, school boards, and insurance carriers expect implemented, documented control measures at the follow up inspection. Purchase orders and proposals are not sufficient to clear a public health notice or satisfy strict liability requirements for public entities.

Installed point of use filtration with FDA and ASTM documentation provides a clear, auditable corrective measure.

MWT systems are designed for same day dispatch and allow facility maintenance staff to complete installation in under five minutes per fixture. This ensures student and staff safety while maintaining regulatory compliance using medical grade technology without the need for licensed plumbers or facility wide shutdowns.

Talk to Our Technical Support Team

Products, sample kits, compliance documentation - we respond within one business day.

bottom of page